Construction Album
Page 6
March 28th, 2oo1
Frank the sheet metal man on the left works on the pizza oven hood
n Bob the right is adding some trim work.
This foto was taken Wednesday March 28th, 2oo1. The pizzzzzzzza oven
hood is all but done,
I call it the Revere Ware (as in post n pans) look, mixing the copper
n stainless together. Still have not added the exhaust fan on the roof
but the hole is cut in-between the roof rafters, so all we are waiting
for is a little good weather be for we cut the double layer of
Diviten rubber roofing.
Here is the wife on the left n her decorating cohort Michael. Today
they were scheming on what to do with the walls after I stop making a "mess"
as they call my design n handy work as a carpenter n sheet metal worker's
helper.